Skip to content
onagero

Lead time analysis: where orders really sit

The processing time of an order is planned. The time it sits between two points is not, and it is usually longer. Onagero assembles the actual path of every order from your timestamps.

  • Runs on your server
  • Reads only, never writes
  • GDPR ready
  • First result in weeks

In short

Onagero reconstructs the path of every order from the timestamps in your systems: order creation, release, material availability, production start, confirmations, shipment. The tool shows how the lead time divides into processing and idle time, by department, operation and order type.

How your team describes it

Your experts say what they need in their own words. Onagero finds the right data and builds the tool in a test stage; after your release it runs in operation.

Work preparation
„Show me where our orders sit between receipt and shipment, and for how long at each point.“
Analyze lead time, as a tool in the browser

What the tool takes over

Three steps done by hand today. The tool your team builds with Onagero then does them itself.

Reconstructing

From scattered timestamps, the path of every order emerges, step by step.

Breaking down

Processing and idle time separated, per point. Rush orders, blanket order call-offs and standard orders kept apart.

Showing bottlenecks

Where do orders pile up, on which weekday, for which item group?

Typical situations

This is what the value looks like day to day.

Customers complain about long delivery times

The tool shows that the order waited three days for release, not for production.

Improvement project

Measured before and after, on the same scale, instead of estimated.

New position in work preparation

Is it worth it? The idle time ahead of work preparation shows how large the pile-up is.

Weekly meeting

The ten orders with the longest idle time this week, with the reason, as far as it was posted.

Which data is needed

  • Order header and items with creation and release date
  • Production orders with start and confirmations
  • Material and purchase order data, where orders wait for material
  • Shipping and delivery note data

Only what your IT releases is read. Names are masked in the development stage. How the data path works

What you end up with

A tool that breaks the lead time per order type into processing and idle time, shows the points with the longest idle time and opens each individual order as a timeline.

Two colleagues walk through a process on paper on the shop floor.

Start with one problem.
Keep the capability.

No AI transformation. One real process, solved on your data in a few weeks. Your team solves the next one itself.

How your price is formed

After the demo you get a fixed offer. Scope, goal and price are set in writing before it starts.

The start
A fixed offerafter the demo

One real problem, the data sources it needs, your Onagero environment on your server, and the first solution, built with your team and measured against the agreed goal.

  • Scope, goal and price in writing before the start
  • First running solution in a few weeks
  • Your data and results stay exportable at any time
The platform
Monthlyfor your Onagero environment

Operating the platform on your server: monitoring, reviewed updates, backup and rehearsed recovery, and maintenance of the connections when systems change.

  • Begins only once the start has reached its goal
  • Your team builds further solutions itself, in the same environment
  • Roles, releases and logs included

What you can rely on

The tool reads, computes and shows. These things it never does, and that is in the contract.

  • Onagero changes no processes in the ERP.
  • It invents no timestamps. Steps without a posting remain visible as a gap.
  • It does not evaluate individual employees.

Questions about Analyze lead time

Do we need process mining software?

Not for this question. Onagero builds the evaluation directly from your data. If you want to analyze many processes permanently, a platform can make sense.

What if not every step has a timestamp?

Then the tool works with the ones that exist and shows between which points it knows nothing. That is often already revealing.

How far back can one look?

As far as the data reaches. Twelve months is usually sensible, so that seasonal fluctuations become visible.

Is this subject to co-determination?

If the evaluation allows conclusions about individual employees, generally yes. We evaluate by points and orders, not by persons, and disclose that.

A direct line

Write two sentences about Analyze lead time. You get an answer from a person who builds the tool themselves.

Email

hallo@onagero.com

Prefer something structured? The fit check asks seven questions and tells you right away whether a pilot fits.

Which problem would
your team solve first?

Show us a real process. We will show you how it could look with Onagero.

Book a demo →

Check first whether a pilot fits: fit check in 2 minutes →